Section 25199.5 Of Article 8.7. Procedures For The Approval Of New Facilities From California Health And Safety Code >> Division 20. >> Chapter 6.5. >> Article 8.7.
25199.5
. (a) At the request of an applicant, the legislative body
of a local agency shall, within 60 calendar days after the local
agency has determined that an application for a land use decision for
a hazardous waste facility project is complete, issue an initial
written determination on whether the hazardous waste facility project
is consistent with both of the following:
(1) The applicable local general plan and zoning ordinances in
effect at the time the application was received.
(2) The county hazardous waste management plan authorized by
Article 3.5 (commencing with Section 25135), if the plan is in effect
at the time of the application.
(b) The local agency shall send a copy of the written
determination made pursuant to subdivision (a) to the applicant.
(c) The determination required by subdivision (a) does not
prohibit a local agency from making a different determination when
the final land use decision is made, if the final determination is
based on information which was not considered at the time the initial
determination was made.