Section 20209.12 Of Article 6.8. Transit Design-build Contracts From California Public Contract Code >> Division 2. >> Part 3. >> Chapter 1. >> Article 6.8.
20209.12
. Each transit operator that elects to proceed under this
article and use the design-build method on a public works project
shall prepare and deliver to the Legislative Analyst's Office within
120 days of the design-build project being put into operation or by
December 1, 2015, whichever occurs first, a report containing a
description of each public works project financed with public funds,
procured through the design-build process, and completed on or before
November 1, 2015. However, if a project has been commenced, but not
completed on or before November 1, 2015, the transit operator shall
complete a report no later than 120 days after completion of the
project. The report shall include, but not be limited to, all of the
following information:
(a) The type of facility.
(b) The gross square footage of the facility.
(c) The company or contractor who was awarded the project.
(d) The estimated and actual length of time to complete the
project.
(e) The findings established pursuant to Section 20133.
(f) Any Labor Code violations discovered during the course of
construction or following completion of the project, as well as any
fines or penalties assessed.
(g) The estimated and actual project cost.
(h) A description of any written protests concerning any aspect of
the solicitation, bid, proposal, or award of the design-build
project, including the resolution of the protest.
(i) An assessment of the prequalification process and criteria.
(j) An assessment of the impact of retaining 5 percent retention
on the project.
(k) A description of the labor force compliance program and an
assessment of the project impact, where required.
(l) A description of the method used to award the contract. If
best value was the method, the factors used to evaluate the bid shall
be described, including the weighting of each factor and an
assessment of the effectiveness of the methodology.
(m) An assessment of the project impact of "skilled labor force
availability."
(n) An assessment of the design-build dollar limits on transit
projects. This shall include projects where the transit operator
wanted to use design-build and was precluded by the dollar
limitation. It shall also include projects where the best value
method of awarding contracts was not used, due to dollar limitations.
(o) An assessment of the most appropriate uses for the
design-build approach.
(p) Any transit operator that elects not to use the authority
granted may also submit a report to the entities named in accordance
with the schedule in this section. This report may include an
analysis of why the authority granted was not used by the operator.