Section 16020 Of Article 4. Qualifications And Reporting From California Health And Safety Code >> Division 12.5. >> Chapter 2. >> Article 4.
16020
. Periodically, as the work of construction or alteration
progresses and whenever the enforcement agency requires, except as
exempt under Section 16010, the architect, civil engineer, or
structural engineer in general responsible charge of the work of
construction, and the registered engineer shall make a report, duly
verified by him or her through periodic review of construction,
showing that the work during the period covered by the report has
been performed and that the materials used and installed are in
accordance with the approved drawings and specifications, setting
forth any detailed statements of fact required by the enforcement
agency.
"Periodic review of construction," as used in this section and as
applied to the architect, civil engineer, or structural engineer and
the registered engineer, means the knowledge which is obtained from
periodic visits to the project site of reasonable frequency for the
purpose of general observation of the work, and also which is
obtained from the reporting of others as to the progress of the work,
testing of materials, inspection and superintendence of the work
that is performed between those periodic visits of the architect,
civil engineer, or structural engineer, or the registered engineer.
The exercise of reasonable diligence to obtain the facts is required.
The term "periodic review of construction" does not include
responsibility for superintendence of construction processes, site
conditions, operations, equipment, personnel, or the maintenance of a
safe place to work or any safety in, on, or about the site of work.