Section 22167 Of Chapter 4. Local Agency Design-build Projects From California Public Contract Code >> Division 2. >> Part 3. >> Chapter 4.
22167
. (a) If the local agency elects to award a project pursuant
to this article, retention proceeds withheld by the local agency from
the design-build entity shall not exceed 5 percent if a performance
and payment bond, issued by an admitted surety insurer, is required
in the solicitation of bids.
(b) In a contract between the design-build entity and a
subcontractor, and in a contract between a subcontractor and any
subcontractor thereunder, the percentage of the retention proceeds
withheld may not exceed the percentage specified in the contract
between the local agency and the design-build entity. If the
design-build entity provides written notice to any subcontractor that
is not a member of the design-build entity, prior to or at the time
the bid is requested, that a bond may be required and the
subcontractor subsequently is unable or refuses to furnish a bond to
the design-build entity, then the design-build entity may withhold
retention proceeds in excess of the percentage specified in the
contract between the local agency and the design-build entity from
any payment made by the design-build entity to the subcontractor.