Section 132445 Of Chapter 6. Pasadena Metro Blue Line Construction Authority From California Public Utilities Code >> Division 12.7. >> Chapter 6.
132445
. The authority shall not encumber the project with any
obligation that is transferable to the LACMTA upon completion of the
design and construction of the project. The design and construction
to be administered by the authority does not include rolling stock,
which is a component of the operation of the project and shall be
administered by the LACMTA. This section does not apply to any joint
development programs, as authorized under paragraph (5) of
subdivision (a) of Section 132410, that may be utilized to contribute
to the financing of project design and construction.