Article 5. Powers And Functions of California Public Utilities Code >> Division 6. >> Chapter 8. >> Article 5.
Connections of all sewers within the special district to
intercepting sewers of the district shall be made at such points and
in such manner and under such rules, regulations, terms, charges, and
conditions as the board may prescribe.
Nothing in this division shall require the district to
construct any sewers other than intercepting and outfall sewers. The
determination by the board of what are intercepting and outfall
sewers within the meaning of this division is final and conclusive.
Upon completion of sewage disposal facilities for any
special district all sewage and industrial waste originating within
the special district shall be disposed of through the sewage disposal
facilities of the district.
Without limiting in any way the foregoing provisions of this
division, the respective public agencies within the district and the
district may contract regarding the collection, treatment, or
disposition of sewage.
Each utility which a district is authorized to acquire,
construct, own, operate, control, or use pursuant to this division
shall be considered to be a utility owned and operated by the
district even though service therefrom is limited to a special
district created as provided in this division.