2827
. (a) The Legislature finds and declares that a program to
provide net energy metering combined with net surplus compensation,
co-energy metering, and wind energy co-metering for eligible
customer-generators is one way to encourage substantial private
investment in renewable energy resources, stimulate in-state economic
growth, reduce demand for electricity during peak consumption
periods, help stabilize California's energy supply infrastructure,
enhance the continued diversification of California's energy resource
mix, reduce interconnection and administrative costs for electricity
suppliers, and encourage conservation and efficiency.
(b) As used in this section, the following terms have the
following meanings:
(1) "Co-energy metering" means a program that is the same in all
other respects as a net energy metering program, except that the
local publicly owned electric utility has elected to apply a
generation-to-generation energy and time-of-use credit formula as
provided in subdivision (i).
(2) "Electrical cooperative" means an electrical cooperative as
defined in Section 2776.
(3) "Electric utility" means an electrical corporation, a local
publicly owned electric utility, or an electrical cooperative, or any
other entity, except an electric service provider, that offers
electrical service. This section shall not apply to a local publicly
owned electric utility that serves more than 750,000 customers and
that also conveys water to its customers.
(4) (A) "Eligible customer-generator" means a residential
customer, small commercial customer as defined in subdivision (h) of
Section 331, or commercial, industrial, or agricultural customer of
an electric utility, who uses a renewable electrical generation
facility, or a combination of those facilities, with a total capacity
of not more than one megawatt, that is located on the customer's
owned, leased, or rented premises, and is interconnected and operates
in parallel with the electrical grid, and is intended primarily to
offset part or all of the customer's own electrical requirements.
(B) (i) Notwithstanding subparagraph (A), "eligible
customer-generator" includes the Department of Corrections and
Rehabilitation using a renewable electrical generation technology, or
a combination of renewable electrical generation technologies, with
a total capacity of not more than eight megawatts, that is located on
the department's owned, leased, or rented premises, and is
interconnected and operates in parallel with the electrical grid, and
is intended primarily to offset part or all of the facility's own
electrical requirements. The amount of any wind generation exported
to the electrical grid shall not exceed 1.35 megawatt at any time.
(ii) Notwithstanding paragraph (2) of subdivision (e), an
electrical corporation shall be afforded a prudent but necessary
time, as determined by the executive director of the commission, to
study the impacts of a request for interconnection of a renewable
generator with a capacity of greater than one megawatt under this
subparagraph. If the study reveals the need for upgrades to the
transmission or distribution system arising solely from the
interconnection, the electrical corporation shall be afforded the
time necessary to complete those upgrades before the interconnection
and those costs shall be borne by the customer-generator. Upgrade
projects shall comply with applicable state and federal requirements,
including requirements of the Federal Energy Regulatory Commission.
(C) (i) For purposes of this subparagraph, a "United States Armed
Forces base or facility" is an establishment under the jurisdiction
of the United States Army, Navy, Air Force, Marine Corps, or Coast
Guard.
(ii) Notwithstanding subparagraph (A), a United States Armed
Forces base or facility is an "eligible customer-generator" if the
base or facility uses a renewable electrical generation facility, or
a combination of those facilities, the renewable electrical
generation facility is located on premises owned, leased, or rented
by the United States Armed Forces base or facility, the renewable
electrical generation facility is interconnected and operates in
parallel with the electrical grid, the renewable electrical
generation facility is intended primarily to offset part or all of
the base or facility's own electrical requirements, and the renewable
electrical generation facility has a generating capacity that does
not exceed the lesser of 12 megawatts or one megawatt greater than
the minimum load of the base or facility over the prior 36 months.
Unless prohibited by federal law, a renewable electrical generation
facility shall not be eligible for net energy metering for privatized
military housing pursuant to this subparagraph if the renewable
electrical generation facility was procured using a sole source
process. A renewable electrical generation facility procured using
best value criteria, if otherwise eligible, may be used for net
energy metering for privatized military housing pursuant to this
subparagraph. For these purposes, "best value criteria" means a value
determined by objective criteria and may include, but is not limited
to, price, features, functions, and life-cycle costs.
(iii) A United States Armed Forces base or facility that is an
eligible customer generator pursuant to this subparagraph shall not
receive compensation for exported generation.
(iv) Notwithstanding paragraph (2) of subdivision (e), an
electrical corporation shall be afforded a prudent but necessary
time, as determined by the executive director of the commission but
not less than 60 working days, to study the impacts of a request for
interconnection of a renewable electrical generation facility with a
capacity of greater than one megawatt pursuant to this subparagraph.
If the study reveals the need for upgrades to the transmission or
distribution system arising solely from the interconnection, the
electrical corporation shall be afforded the time necessary to
complete those upgrades before the interconnection and the costs of
those upgrades shall be borne by the eligible customer-generator.
Upgrade projects shall comply with applicable state and federal
requirements, including requirements of the Federal Energy Regulatory
Commission. For any renewable generation facility that interconnects
directly to the transmission grid or that requires transmission
upgrades, the United States Armed Forces base or facility shall
comply with all Federal Energy Regulatory Commission interconnection
procedures and requirements.
(v) An electrical corporation shall make a tariff, as approved by
the commission, available pursuant to this subparagraph by November
1, 2015.
(5) "Large electrical corporation" means an electrical corporation
with more than 100,000 service connections in California.
(6) "Net energy metering" means measuring the difference between
the electricity supplied through the electrical grid and the
electricity generated by an eligible customer-generator and fed back
to the electrical grid over a 12-month period as described in
subdivisions (c) and (h).
(7) "Net surplus customer-generator" means an eligible
customer-generator that generates more electricity during a 12-month
period than is supplied by the electric utility to the eligible
customer-generator during the same 12-month period.
(8) "Net surplus electricity" means all electricity generated by
an eligible customer-generator measured in kilowatthours over a
12-month period that exceeds the amount of electricity consumed by
that eligible customer-generator.
(9) "Net surplus electricity compensation" means a per
kilowatthour rate offered by the electric utility to the net surplus
customer-generator for net surplus electricity that is set by the
ratemaking authority pursuant to subdivision (h).
(10) "Ratemaking authority" means, for an electrical corporation,
the commission, for an electrical cooperative, its ratesetting body
selected by its shareholders or members, and for a local publicly
owned electric utility, the local elected body responsible for
setting the rates of the local publicly owned utility.
(11) "Renewable electrical generation facility" means a facility
that generates electricity from a renewable source listed in
paragraph (1) of subdivision (a) of Section 25741 of the Public
Resources Code. A small hydroelectric generation facility is not an
eligible renewable electrical generation facility if it will cause an
adverse impact on instream beneficial uses or cause a change in the
volume or timing of streamflow.
(12) "Wind energy co-metering" means any wind energy project
greater than 50 kilowatts, but not exceeding one megawatt, where the
difference between the electricity supplied through the electrical
grid and the electricity generated by an eligible customer-generator
and fed back to the electrical grid over a 12-month period is as
described in subdivision (h). Wind energy co-metering shall be
accomplished pursuant to Section 2827.8.
(c) (1) Except as provided in paragraph (4) and in Section 2827.1,
every electric utility shall develop a standard contract or tariff
providing for net energy metering, and shall make this standard
contract or tariff available to eligible customer-generators, upon
request, on a first-come-first-served basis until the time that the
total rated generating capacity used by eligible customer-generators
exceeds 5 percent of the electric utility's aggregate customer peak
demand. Net energy metering shall be accomplished using a single
meter capable of registering the flow of electricity in two
directions. An additional meter or meters to monitor the flow of
electricity in each direction may be installed with the consent of
the eligible customer-generator, at the expense of the electric
utility, and the additional metering shall be used only to provide
the information necessary to accurately bill or credit the eligible
customer-generator pursuant to subdivision (h), or to collect
generating system performance information for research purposes
relative to a renewable electrical generation facility. If the
existing electrical meter of an eligible customer-generator is not
capable of measuring the flow of electricity in two directions, the
eligible customer-generator shall be responsible for all expenses
involved in purchasing and installing a meter that is able to measure
electricity flow in two directions. If an additional meter or meters
are installed, the net energy metering calculation shall yield a
result identical to that of a single meter. An eligible
customer-generator that is receiving service other than through the
standard contract or tariff may elect to receive service through the
standard contract or tariff until the electric utility reaches the
generation limit set forth in this paragraph. Once the generation
limit is reached, only eligible customer-generators that had
previously elected to receive service pursuant to the standard
contract or tariff have a right to continue to receive service
pursuant to the standard contract or tariff. Eligibility for net
energy metering does not limit an eligible customer-generator's
eligibility for any other rebate, incentive, or credit provided by
the electric utility, or pursuant to any governmental program,
including rebates and incentives provided pursuant to the California
Solar Initiative.
(2) An electrical corporation shall include a provision in the net
energy metering contract or tariff requiring that any customer with
an existing electrical generating facility and meter who enters into
a new net energy metering contract shall provide an inspection report
to the electrical corporation, unless the electrical generating
facility and meter have been installed or inspected within the
previous three years. The inspection report shall be prepared by a
California licensed contractor who is not the owner or operator of
the facility and meter. A California licensed electrician shall
perform the inspection of the electrical portion of the facility and
meter.
(3) (A) On an annual basis, every electric utility shall make
available to the ratemaking authority information on the total rated
generating capacity used by eligible customer-generators that are
customers of that provider in the provider's service area and the net
surplus electricity purchased by the electric utility pursuant to
this section.
(B) An electric service provider operating pursuant to Section 394
shall make available to the ratemaking authority the information
required by this paragraph for each eligible customer-generator that
is their customer for each service area of an electrical corporation,
local publicly owned electrical utility, or electrical cooperative,
in which the eligible customer-generator has net energy metering.
(C) The ratemaking authority shall develop a process for making
the information required by this paragraph available to electric
utilities, and for using that information to determine when, pursuant
to paragraphs (1) and (4), an electric utility is not obligated to
provide net energy metering to additional eligible
customer-generators in its service area.
(4) (A) An electric utility that is not a large electrical
corporation is not obligated to provide net energy metering to
additional eligible customer-generators in its service area when the
combined total peak demand of all electricity used by eligible
customer-generators served by all the electric utilities in that
service area furnishing net energy metering to eligible
customer-generators exceeds 5 percent of the aggregate customer peak
demand of those electric utilities.
(B) The commission shall require every large electrical
corporation to make the standard contract or tariff available to
eligible customer-generators, continuously and without interruption,
until such times as the large electrical corporation reaches its net
energy metering program limit or July 1, 2017, whichever is earlier.
A large electrical corporation reaches its program limit when the
combined total peak demand of all electricity used by eligible
customer-generators served by all the electric utilities in the large
electrical corporation's service area furnishing net energy metering
to eligible customer-generators exceeds 5 percent of the aggregate
customer peak demand of those electric utilities. For purposes of
calculating a large electrical corporation's program limit,
"aggregate customer peak demand" means the highest sum of the
noncoincident peak demands of all of the large electrical corporation'
s customers that occurs in any calendar year. To determine the
aggregate customer peak demand, every large electrical corporation
shall use a uniform method approved by the commission. The program
limit calculated pursuant to this paragraph shall not be less than
the following:
(i) For San Diego Gas and Electric Company, when it has made 607
megawatts of nameplate generating capacity available to eligible
customer-generators.
(ii) For Southern California Edison Company, when it has made
2,240 megawatts of nameplate generating capacity available to
eligible customer-generators.
(iii) For Pacific Gas and Electric Company, when it has made 2,409
megawatts of nameplate generating capacity available to eligible
customer-generators.
(C) Every large electrical corporation shall file a monthly report
with the commission detailing the progress toward the net energy
metering program limit established in subparagraph (B). The report
shall include separate calculations on progress toward the limits
based on operating solar energy systems, cumulative numbers of
interconnection requests for net energy metering eligible systems,
and any other criteria required by the commission.
(D) Beginning July 1, 2017, or upon reaching the net metering
program limit of subparagraph (B), whichever is earlier, the
obligation of a large electrical corporation to provide service
pursuant to a standard contract or tariff shall be pursuant to
Section 2827.1 and applicable state and federal requirements.
(d) Every electric utility shall make all necessary forms and
contracts for net energy metering and net surplus electricity
compensation service available for download from the Internet.
(e) (1) Every electric utility shall ensure that requests for
establishment of net energy metering and net surplus electricity
compensation are processed in a time period not exceeding that for
similarly situated customers requesting new electric service, but not
to exceed 30 working days from the date it receives a completed
application form for net energy metering service or net surplus
electricity compensation, including a signed interconnection
agreement from an eligible customer-generator and the electric
inspection clearance from the governmental authority having
jurisdiction.
(2) Every electric utility shall ensure that requests for an
interconnection agreement from an eligible customer-generator are
processed in a time period not to exceed 30 working days from the
date it receives a completed application form from the eligible
customer-generator for an interconnection agreement.
(3) If an electric utility is unable to process a request within
the allowable timeframe pursuant to paragraph (1) or (2), it shall
notify the eligible customer-generator and the ratemaking authority
of the reason for its inability to process the request and the
expected completion date.
(f) (1) If a customer participates in direct transactions pursuant
to paragraph (1) of subdivision (b) of Section 365, or Section
365.1, with an electric service provider that does not provide
distribution service for the direct transactions, the electric
utility that provides distribution service for the eligible
customer-generator is not obligated to provide net energy metering or
net surplus electricity compensation to the customer.
(2) If a customer participates in direct transactions pursuant to
paragraph (1) of subdivision (b) of Section 365 or 365.1 with an
electric service provider, and the customer is an eligible
customer-generator, the electric utility that provides distribution
service for the direct transactions may recover from the customer's
electric service provider the incremental costs of metering and
billing service related to net energy metering and net surplus
electricity compensation in an amount set by the ratemaking
authority.
(g) Except for the time-variant kilowatthour pricing portion of
any tariff adopted by the commission pursuant to paragraph (4) of
subdivision (a) of Section 2851, each net energy metering contract or
tariff shall be identical, with respect to rate structure, all
retail rate components, and any monthly charges, to the contract or
tariff to which the same customer would be assigned if the customer
did not use a renewable electrical generation facility, except that
eligible customer-generators shall not be assessed standby charges on
the electrical generating capacity or the kilowatthour production of
a renewable electrical generation facility. The charges for all
retail rate components for eligible customer-generators shall be
based exclusively on the customer-generator's net kilowatthour
consumption over a 12-month period, without regard to the eligible
customer-generator's choice as to from whom it purchases electricity
that is not self-generated. Any new or additional demand charge,
standby charge, customer charge, minimum monthly charge,
interconnection charge, or any other charge that would increase an
eligible customer-generator's costs beyond those of other customers
who are not eligible customer-generators in the rate class to which
the eligible customer-generator would otherwise be assigned if the
customer did not own, lease, rent, or otherwise operate a renewable
electrical generation facility is contrary to the intent of this
section, and shall not form a part of net energy metering contracts
or tariffs.
(h) For eligible customer-generators, the net energy metering
calculation shall be made by measuring the difference between the
electricity supplied to the eligible customer-generator and the
electricity generated by the eligible customer-generator and fed back
to the electrical grid over a 12-month period. The following rules
shall apply to the annualized net metering calculation:
(1) The eligible residential or small commercial
customer-generator, at the end of each 12-month period following the
date of final interconnection of the eligible customer-generator's
system with an electric utility, and at each anniversary date
thereafter, shall be billed for electricity used during that 12-month
period. The electric utility shall determine if the eligible
residential or small commercial customer-generator was a net consumer
or a net surplus customer-generator during that period.
(2) At the end of each 12-month period, where the electricity
supplied during the period by the electric utility exceeds the
electricity generated by the eligible residential or small commercial
customer-generator during that same period, the eligible residential
or small commercial customer-generator is a net electricity consumer
and the electric utility shall be owed compensation for the eligible
customer-generator's net kilowatthour consumption over that 12-month
period. The compensation owed for the eligible residential or small
commercial customer-generator's consumption shall be calculated as
follows:
(A) For all eligible customer-generators taking service under
contracts or tariffs employing "baseline" and "over baseline" rates,
any net monthly consumption of electricity shall be calculated
according to the terms of the contract or tariff to which the same
customer would be assigned to, or be eligible for, if the customer
was not an eligible customer-generator. If those same
customer-generators are net generators over a billing period, the net
kilowatthours generated shall be valued at the same price per
kilowatthour as the electric utility would charge for the baseline
quantity of electricity during that billing period, and if the number
of kilowatthours generated exceeds the baseline quantity, the excess
shall be valued at the same price per kilowatthour as the electric
utility would charge for electricity over the baseline quantity
during that billing period.
(B) For all eligible customer-generators taking service under
contracts or tariffs employing time-of-use rates, any net monthly
consumption of electricity shall be calculated according to the terms
of the contract or tariff to which the same customer would be
assigned, or be eligible for, if the customer was not an eligible
customer-generator. When those same customer-generators are net
generators during any discrete time-of-use period, the net
kilowatthours produced shall be valued at the same price per
kilowatthour as the electric utility would charge for retail
kilowatthour sales during that same time-of-use period. If the
eligible customer-generator's time-of-use electrical meter is unable
to measure the flow of electricity in two directions, paragraph (1)
of subdivision (c) shall apply.
(C) For all eligible residential and small commercial
customer-generators and for each billing period, the net balance of
moneys owed to the electric utility for net consumption of
electricity or credits owed to the eligible customer-generator for
net generation of electricity shall be carried forward as a monetary
value until the end of each 12-month period. For all eligible
commercial, industrial, and agricultural customer-generators, the net
balance of moneys owed shall be paid in accordance with the electric
utility's normal billing cycle, except that if the eligible
commercial, industrial, or agricultural customer-generator is a net
electricity producer over a normal billing cycle, any excess
kilowatthours generated during the billing cycle shall be carried
over to the following billing period as a monetary value, calculated
according to the procedures set forth in this section, and appear as
a credit on the eligible commercial, industrial, or agricultural
customer-generator's account, until the end of the annual period when
paragraph (3) shall apply.
(3) At the end of each 12-month period, where the electricity
generated by the eligible customer-generator during the 12-month
period exceeds the electricity supplied by the electric utility
during that same period, the eligible customer-generator is a net
surplus customer-generator and the electric utility, upon an
affirmative election by the net surplus customer-generator, shall
either (A) provide net surplus electricity compensation for any net
surplus electricity generated during the prior 12-month period, or
(B) allow the net surplus customer-generator to apply the net surplus
electricity as a credit for kilowatthours subsequently supplied by
the electric utility to the net surplus customer-generator. For an
eligible customer-generator that does not affirmatively elect to
receive service pursuant to net surplus electricity compensation, the
electric utility shall retain any excess kilowatthours generated
during the prior 12-month period. The eligible customer-generator not
affirmatively electing to receive service pursuant to net surplus
electricity compensation shall not be owed any compensation for the
net surplus electricity unless the electric utility enters into a
purchase agreement with the eligible customer-generator for those
excess kilowatthours. Every electric utility shall provide notice to
eligible customer-generators that they are eligible to receive net
surplus electricity compensation for net surplus electricity, that
they must elect to receive net surplus electricity compensation, and
that the 12-month period commences when the electric utility receives
the eligible customer-generator's election. For an electric utility
that is an electrical corporation or electrical cooperative, the
commission may adopt requirements for providing notice and the manner
by which eligible customer-generators may elect to receive net
surplus electricity compensation.
(4) (A) An eligible customer-generator with multiple meters may
elect to aggregate the electrical load of the meters located on the
property where the renewable electrical generation facility is
located and on all property adjacent or contiguous to the property on
which the renewable electrical generation facility is located, if
those properties are solely owned, leased, or rented by the eligible
customer-generator. If the eligible customer-generator elects to
aggregate the electric load pursuant to this paragraph, the electric
utility shall use the aggregated load for the purpose of determining
whether an eligible customer-generator is a net consumer or a net
surplus customer-generator during a 12-month period.