Section 4355 Of Chapter 4. Enforcement Of Federal Pipeline Safety Standards For Mobilehome Park Operators From California Public Utilities Code >> Division 2. >> Chapter 4.
4355
. Except as specified in Section 4356, after each inspection,
the commission shall furnish the operator, or a representative
designated in writing by the operator, with a written copy of the
inspection report within 30 days of the inspection, and the report
shall indicate any violations of applicable federal or state pipeline
safety laws or regulations. Upon receipt of a report indicating a
safety violation, the operator shall file, within 30 days, a written
response with the commission which acknowledges receipt of the report
and specifies a compliance plan for correcting the safety
violations, including, if appropriate, a timetable for completing
necessary repairs or improvements to the distribution system. The
commission shall furnish copies of inspection reports indicating
safety violations, and responses to these reports, to the United
States Department of Transportation and to the department.