Section 4455 Of Chapter 4.1. Enforcement Of Federal Pipeline Safety Standards For Propane Operators From California Public Utilities Code >> Division 2. >> Chapter 4.1.
4455
. Except as specified in Section 4456, after each inspection,
the commission shall furnish the operator, or a representative
designated in writing by the operator, with a written copy of the
inspection report within 30 days of the inspection. The report shall
indicate any violations of applicable federal or state pipeline
safety regulations. The operator shall then file, within 30 days, a
written response with the commission that acknowledges receipt of the
report and specifies a compliance plan for correcting the safety
violations, including, if appropriate, a timetable for completing
necessary repairs or improvements to the distribution system.