167
. (a) Funds in the State Highway Account in the State
Transportation Fund shall be programmed, budgeted subject to Section
163, and expended to maximize the use of federal funds and shall be
based on the following sequence of priorities:
(1) Operation, maintenance, and rehabilitation of the state
highway system.
(2) Safety improvements where physical changes, other than adding
additional lanes, would reduce fatalities and the number and severity
of injuries.
(3) Transportation capital improvements that expand capacity or
reduce congestion, or do both.
(4) Environmental enhancement and mitigation programs.
(b) With respect to the funds in the State Highway Account, in the
Public Transportation Account, and in the Passenger Rail Bond Fund,
the proposed budget shall be organized on a program basis. The
proposed budget shall list the proposed expenditures for the
transportation program under the following program elements:
(1) Administration.
(2) Program development.
(3) Maintenance.
(4) State highway operation and protection.
(5) Local assistance.
(6) Interregional improvements.
(7) Regional improvements.
(8) Environmental enhancement and mitigation programs.
(c) State operations expenditure amounts of the department for
interregional and regional transportation improvement projects shall
be listed as required by subdivision (b) of Section 14529 of the
Government Code, but those amounts other than those for the
acquisition of rights-of-way, construction, and construction support
shall not be subject to allocation by the commission.
(d) To align the annual budget with the adopted state
transportation improvement program, the department may submit to the
Department of Finance revised capital outlay support and capital
outlay budget estimates as part of its May Revision process. Budget
proposals related to these changes shall be provided to the
Legislature no later than May 1.
(e) The budget shall not include specific appropriations for
specific transportation improvement projects, and the Legislature
shall not enact legislation containing specific individual
transportation projects.
(f) The basis for defining major and minor capital outlay projects
shall be established by the commission.
(g) The Legislative Analyst shall prepare an analysis of the
proposed expenditures for each program element as a part of the
budget analysis.
(h) The department shall submit to the Legislative Analyst, and
the Senate Committee on Budget and Fiscal Review and the Assembly
Committee on Budget, on an annual basis, supplemental information to
substantiate the department's proposed capital outlay support budget.
The information shall be provided no later than May 1 of each year,
and may be provided at an earlier date. The information shall
include, but not be limited to, the following:
(1) A list of projects for which the department will perform
capital outlay support work in the budget year. For each project, the
department shall include:
(A) The planned project support budget for support of
environmental, design, right-of-way, and construction phases.
(B) The planned capital costs, including construction capital
costs and right-of-way capital costs.
(C) The estimated or actual construction start date and completion
date.
(D) The name and year of the state transportation program in which
the project is programmed, if applicable.
(E) Total prior fiscal year expenditures for capital outlay
support.
(F) The number of full-time equivalent positions requested to
perform support of environmental, design, right-of-way, and
construction work in the fiscal year of the budget request.
(G) Milestones of project work by phases that are planned to be
completed in the fiscal year of the budget request.
(H) The ratio of support to capital costs based on current
programming.
(2) The capital-to-support ratio for all projects completed in the
prior fiscal year in each program in each district.
(3) The current total number of authorized and vacant positions in
the capital outlay support program in headquarters and in each
district.
(4) A five-year projection of the department's staffing needs to
support the state's transportation capital programs and any workload
performed by the department related to federal or local funding for
highway capital projects.
(5) The average cost of a personnel-year equivalent in each
district based on the department's existing contracts for capital
outlay support work performed by a private company under contract
with the department. For each average cost, the department shall
provide a description of what factors are included in that cost.
(6) The average cost of a state staff personnel-year in the
capital outlay support program in each district and in headquarters.
The cost shall include the salary and wages, benefits, program
overhead, administrative overhead, and other associated costs. The
department shall provide a description of each component of the
average cost.
(7) A summary of expected capital outlay support workload for the
budget year that includes the following:
(A) The total full-time equivalents requested for each type of the
following activities: environmental, design, right-of-way, and
construction.
(B) The total full-time equivalents requested for each type of
project, including, but not limited to, the state transportation
improvement program, the state highway operation and protection
program, bond programs, regional and local agency partnership
workload, and any other program.
(8) The total number of projects with requested resources, as well
as the number of projects in which the department is limited to an
oversight role.
(9) The number of milestones scheduled, including environmental,
design, right-of-way, and construction deliverables, as well as the
number of projects expected to begin construction and reach
completion.
(10) A summary for the most recently completed fiscal year for the
following:
(A) Full-time equivalents and related funding expended, including
support of environmental, design, right-of-way, and construction
activities.
(B) Approved and filled positions as of the end of the fiscal
year.