10631
. A plan shall be adopted in accordance with this chapter that
shall do all of the following:
(a) Describe the service area of the supplier, including current
and projected population, climate, and other demographic factors
affecting the supplier's water management planning. The projected
population estimates shall be based upon data from the state,
regional, or local service agency population projections within the
service area of the urban water supplier and shall be in five-year
increments to 20 years or as far as data is available.
(b) Identify and quantify, to the extent practicable, the existing
and planned sources of water available to the supplier over the same
five-year increments described in subdivision (a). If groundwater is
identified as an existing or planned source of water available to
the supplier, all of the following information shall be included in
the plan:
(1) A copy of any groundwater management plan adopted by the urban
water supplier, including plans adopted pursuant to Part 2.75
(commencing with Section 10750), or any other specific authorization
for groundwater management.
(2) A description of any groundwater basin or basins from which
the urban water supplier pumps groundwater. For basins that a court
or the board has adjudicated the rights to pump groundwater, a copy
of the order or decree adopted by the court or the board and a
description of the amount of groundwater the urban water supplier has
the legal right to pump under the order or decree. For basins that
have not been adjudicated, information as to whether the department
has identified the basin or basins as overdrafted or has projected
that the basin will become overdrafted if present management
conditions continue, in the most current official departmental
bulletin that characterizes the condition of the groundwater basin,
and a detailed description of the efforts being undertaken by the
urban water supplier to eliminate the long-term overdraft condition.
(3) A detailed description and analysis of the location, amount,
and sufficiency of groundwater pumped by the urban water supplier for
the past five years. The description and analysis shall be based on
information that is reasonably available, including, but not limited
to, historic use records.
(4) A detailed description and analysis of the amount and location
of groundwater that is projected to be pumped by the urban water
supplier. The description and analysis shall be based on information
that is reasonably available, including, but not limited to, historic
use records.
(c) (1) Describe the reliability of the water supply and
vulnerability to seasonal or climatic shortage, to the extent
practicable, and provide data for each of the following:
(A) An average water year.
(B) A single-dry water year.
(C) Multiple-dry water years.
(2) For any water source that may not be available at a consistent
level of use, given specific legal, environmental, water quality, or
climatic factors, describe plans to supplement or replace that
source with alternative sources or water demand management measures,
to the extent practicable.
(d) Describe the opportunities for exchanges or transfers of water
on a short-term or long-term basis.
(e) (1) Quantify, to the extent records are available, past and
current water use, over the same five-year increments described in
subdivision (a), and projected water use, identifying the uses among
water use sectors, including, but not necessarily limited to, all of
the following uses:
(A) Single-family residential.
(B) Multifamily.
(C) Commercial.
(D) Industrial.
(E) Institutional and governmental.
(F) Landscape.
(G) Sales to other agencies.
(H) Saline water intrusion barriers, groundwater recharge, or
conjunctive use, or any combination thereof.
(I) Agricultural.
(J) Distribution system water loss.
(2) The water use projections shall be in the same five-year
increments described in subdivision (a).
(3) (A) For the 2015 urban water management plan update, the
distribution system water loss shall be quantified for the most
recent 12-month period available. For all subsequent updates, the
distribution system water loss shall be quantified for each of the
five years preceding the plan update.
(B) The distribution system water loss quantification shall be
reported in accordance with a worksheet approved or developed by the
department through a public process. The water loss quantification
worksheet shall be based on the water system balance methodology
developed by the American Water Works Association.
(4) (A) If available and applicable to an urban water supplier,
water use projections may display and account for the water savings
estimated to result from adopted codes, standards, ordinances, or
transportation and land use plans identified by the urban water
supplier, as applicable to the service area.
(B) To the extent that an urban water supplier reports the
information described in subparagraph (A), an urban water supplier
shall do both of the following:
(i) Provide citations of the various codes, standards, ordinances,
or transportation and land use plans utilized in making the
projections.
(ii) Indicate the extent that the water use projections consider
savings from codes, standards, ordinances, or transportation and land
use plans. Water use projections that do not account for these water
savings shall be noted of that fact.
(f) Provide a description of the supplier's water demand
management measures. This description shall include all of the
following:
(1) (A) For an urban retail water supplier, as defined in Section
10608.12, a narrative description that addresses the nature and
extent of each water demand management measure implemented over the
past five years. The narrative shall describe the water demand
management measures that the supplier plans to implement to achieve
its water use targets pursuant to Section 10608.20.
(B) The narrative pursuant to this paragraph shall include
descriptions of the following water demand management measures:
(i) Water waste prevention ordinances.
(ii) Metering.
(iii) Conservation pricing.
(iv) Public education and outreach.
(v) Programs to assess and manage distribution system real loss.
(vi) Water conservation program coordination and staffing support.
(vii) Other demand management measures that have a significant
impact on water use as measured in gallons per capita per day,
including innovative measures, if implemented.
(2) For an urban wholesale water supplier, as defined in Section
10608.12, a narrative description of the items in clauses (ii), (iv),
(vi), and (vii) of subparagraph (B) of paragraph (1), and a
narrative description of its distribution system asset management and
wholesale supplier assistance programs.
(g) Include a description of all water supply projects and water
supply programs that may be undertaken by the urban water supplier to
meet the total projected water use, as established pursuant to
subdivision (a) of Section 10635. The urban water supplier shall
include a detailed description of expected future projects and
programs that the urban water supplier may implement to increase the
amount of the water supply available to the urban water supplier in
average, single-dry, and multiple-dry water years. The description
shall identify specific projects and include a description of the
increase in water supply that is expected to be available from each
project. The description shall include an estimate with regard to the
implementation timeline for each project or program.
(h) Describe the opportunities for development of desalinated
water, including, but not limited to, ocean water, brackish water,
and groundwater, as a long-term supply.
(i) For purposes of this part, urban water suppliers that are
members of the California Urban Water Conservation Council shall be
deemed in compliance with the requirements of subdivision (f) by
complying with all the provisions of the "Memorandum of Understanding
Regarding Urban Water Conservation in California," dated December
10, 2008, as it may be amended, and by submitting the annual reports
required by Section 6.2 of that memorandum.
(j) An urban water supplier that relies upon a wholesale agency
for a source of water shall provide the wholesale agency with water
use projections from that agency for that source of water in
five-year increments to 20 years or as far as data is available. The
wholesale agency shall provide information to the urban water
supplier for inclusion in the urban water supplier's plan that
identifies and quantifies, to the extent practicable, the existing
and planned sources of water as required by subdivision (b),
available from the wholesale agency to the urban water supplier over
the same five-year increments, and during various water-year types in
accordance with subdivision (c). An urban water supplier may rely
upon water supply information provided by the wholesale agency in
fulfilling the plan informational requirements of subdivisions (b)
and (c).