Section 12670.7 Of Article 2. Projects In The Sacramento-san Joaquin Watersheds From California Water Code >> Division 6. >> Part 6. >> Chapter 2. >> Article 2.
12670.7
. (a) The project for flood protection along the Feather
River and Yuba River is adopted and authorized substantially in
accordance with the recommendations of the Chief of Engineers of the
United States Army Corps of Engineers, in the report entitled "Yuba
River Basin Investigation, California Feasibility Report."
(b) Notwithstanding subdivision (e) of Section 12585.5, the
nonfederal engineering costs and the nonfederal design costs required
by Section 2215 (b) and (c) of Title 33 of the United States Code,
with regard to the project described in subdivision (a), are eligible
for reimbursement by the state before federal and state
authorization and before the appropriation of construction funds by
Congress.
(c) Funds shall be appropriated for the project in the annual
Budget Act.