Section 14019 Of Article 2. California Safe Drinking Water Program From California Water Code >> Division 7. >> Chapter 16. >> Article 2.
14019
. Preliminary design work, including a cost estimate for the
project, shall be completed before a loan or grant is awarded.
Operation and maintenance costs shall be the responsibility of the
supplier and may not be considered as part of the project cost. Costs
for planning and preliminary engineering studies may be reimbursed
following the receipt of a loan or grant, subject to approval by the
department and the State Department of Health Services.