55659
. A copy of the petition shall be filed with the county
engineer of waterworks districts, or district engineer if one has
been appointed, at least two weeks before the petition is presented
to the board. The county engineer of waterworks districts or district
engineer, as the case may be, shall prepare and file with the board,
at least one week before the date set for the hearing on the
petition, a report containing cost estimates and preliminary plans
and specifications for the proposed improvements, together with any
recommendations as to the boundaries of the proposed zone, and any
other pertinent information relating to the feasibility of the
proposed improvements or proposed zone. The engineer's report shall
be available in the office of the board for public inspection, and
may be considered by the board at the hearing on the petition.