Chapter 1. Survey of California Water Code >> Division 18. >> Part 6. >> Chapter 1.
Not later than the second Tuesday in February each year the
board shall order an engineering survey and report to be made
regarding the ground water supplies of the district. The same shall
include, among all other information and data which the board may
require, the following:
(1) Records, data and other information for the consideration of
the board in its determination of the annual overdraft;
(2) Records, data and other information for the consideration of
the board in its determination of the accumulated overdraft as of the
last day of the preceding water year;
(3) A report, with supporting data, as to the total production of
ground water from the ground water supplies within the replenishment
district during the preceding water year;
(4) A report, with supporting data, as to the changes during the
preceding water year in the pressure levels or piezometric heights of
the ground water contained within pressure-level areas of the
replenishment district, and as to the effects thereof upon the ground
water supplies within such replenishment district;
(5) An estimate of the annual overdraft for the current water year
and for the ensuing water year;
(6) An estimate of the accumulated overdraft as of the last day of
the current water year;
(7) An estimate of the total production of ground water from the
ground water supplies within the replenishment district for the
current water year and for the ensuing water year;
(8) An estimate of the changes during the current water year in
the pressure levels or piezometric heights of the ground water
contained within pressure-level areas of the replenishment district,
and of the effects thereof upon the ground water supplies within such
replenishment district;
(9) An estimate of the quantity, source, and cost of water
available for replenishment of the ground water supplies during the
ensuing water year under the provisions of Section 60315.
If the district has received an engineering evaluation as to
any matter within the powers of the district under Section 60224 and
containing proposed action or alternate actions and estimated costs,
including engineering and legal fees and expenses and district
overhead, the board may, not later than the second Tuesday in
February of each year, order the inclusion in the engineering survey
and report referred to in Section 60300 of a statement of the
proposed action or alternate actions and those estimated costs.