Section 75541 Of Chapter 2. Establishment Of Zones And Registration Of Water-measuring Devices From California Water Code >> Division 21. >> Part 9. >> Chapter 2.
75541
. Within six months after the date of establishing a zone or
zones, all water-producing facilities located within the boundaries
of such zone or zones shall be registered with the district and, if
required by the board, shall be measured with a water-measuring
device satisfactory to the district, which shall be installed by the
district or, at the district's option, by the operator thereof.