Section 79757 Of Chapter 8. Statewide Water System Operational Improvement And Drought Preparedness From California Water Code >> Division 26.7. >> Chapter 8.
79757
. (a) A project is not eligible for funding under this chapter
unless, by January 1, 2022, all of the following conditions are met:
(1) All feasibility studies are complete and draft environmental
documentation is available for public review.
(2) The commission makes a finding that the project is feasible,
and will advance the long-term objectives of restoring ecological
health and improving water management for beneficial uses of the
Delta.
(3) The director receives commitments for not less than 75 percent
of the nonpublic benefit cost share of the project.
(b) If compliance with subdivision (a) is delayed by litigation or
failure to promulgate regulations, the date in subdivision (a) shall
be extended by the commission for a time period that is equal to the
time period of the delay, and funding under this chapter that has
been dedicated to the project shall be encumbered until the time at
which the litigation is completed or the regulations have been
promulgated.