Section 8623 Of Article 2. Cooperation With The United States From California Water Code >> Division 5. >> Part 4. >> Chapter 3. >> Article 2.
8623
. Notwithstanding any of the provisions of Chapter 1
(commencing with Section 12570) and Chapter 3 (commencing with
Section 12800) of Part 6 of Division 6, the board may plan, design,
and construct flood relief structures or weirs and other structures
or facilities essential for their proper functioning in the vicinity
of the Sacramento River between Big Chico Creek and the north
boundary of Glenn County Levee District No. 3, as needed to assure
proper division of flood flows between the river and adjacent
overflow areas and to preserve the integrity of the Sacramento River
Flood Control Project. No revetment of the river bank may be
installed pursuant to this section except to the extent necessary to
assure the proper division of flood flows as described in this
section. If any revetment is required under this section, it shall be
accomplished by the palisades method, unless the department finds
that method is not feasible.