Section 8999 Of Article 1. Flood Control Works, Purchases And Compensation From California Water Code >> Division 5. >> Part 4. >> Chapter 8. >> Article 1.
8999
. If any reclamation district, levee district, drainage
district, municipal corporation, or person within the drainage
district, with the consent of the board, provides or leaves any land
for a by-pass, waterway, storage basin or sump for the purpose of
complying with the plans to be carried out by the board, or for
carrying out in whole or in part any of the plans or works adopted by
it or erects any levee along the by-pass or waterway, storage basin
or sump, the by-pass, waterway, storage basin, sump, and levee shall
be considered as a part of the work to be done pursuant to the
provisions of this part and proper compensation shall be made for the
right of way or easement through, over and upon the by-pass,
waterway, storage basin or sump and for the actual reasonable cost of
construction of the levees, cuts, canals or gates.