9614
. The plan shall include all of the following:
(a) A description of the Sacramento-San Joaquin River Flood
Management System and the cities and counties included in the system.
(b) A description of the performance of the system and the
challenges to modifying the system to provide appropriate levels of
flood protection using available information.
(c) A description of the facilities included in the State Plan of
Flood Control, including all of the following:
(1) The precise location and a brief description of each facility,
a description of the population and property protected by the
facility, the system benefits provided by the facility, if any, and a
brief history of the facility, including the year of construction,
major improvements to the facility, and any failures of the facility.
(2) The design capacity of each facility.
(3) A description and evaluation of the performance of each
facility, including the following:
(A) An evaluation of failure risks due to each of the following:
(i) Overtopping.
(ii) Under seepage and seepage.
(iii) Structural failure.
(iv) Other sources of risk, including seismic risks, that the
department or the board determines are applicable.
(B) A description of any uncertainties regarding performance
capability, including uncertainties arising from the need for
additional engineering evaluations or uncertainties arising from
changed conditions such as changes in estimated channel capacities.
(d) A description of each existing dam that is not part of the
State Plan of Flood Control that provides either significant
systemwide benefits for managing flood risks within the
Sacramento-San Joaquin Valley or protects urban areas within the
Sacramento-San Joaquin Valley.
(e) A description of each existing levee and other flood
management facility not described in subdivision (d) that is not part
of the State Plan of Flood Control and that provides either
significant systemwide benefits for managing flood risks within the
Sacramento-San Joaquin Valley or protects an urban area.
(f) A description of the probable impacts of projected climate
change, projected land use patterns, and other potential flood
management challenges on the ability of the system to provide
adequate levels of flood protection.
(g) An evaluation of the structural improvements and repairs
necessary to bring each of the facilities of the State Plan of Flood
Control to within its design standard. The evaluation shall include a
prioritized list of recommended actions necessary to bring each
facility not identified in subdivision (h) to within its design
standard.
(h) The evaluation shall include a list of facilities recommended
to be removed from the State Plan of Flood Control. For each facility
recommended for removal, the evaluation shall identify both of the
following:
(1) The reasons for proposing the removal of the facility from the
State Plan of Flood Control.
(2) Any additional recommended actions associated with removing
the facility from the State Plan of Flood Control.
(i) A description of both structural and nonstructural methods for
providing an urban level of flood protection to current urban areas.
The description shall also include a list of recommended next steps
to improve urban flood protection.
(j) A description of structural and nonstructural means for
enabling or improving systemwide riverine ecosystem function,
including, but not limited to, establishment of riparian habitat and
seasonal inundation of available flood plains where feasible.